Doina Engineering & Construction

Call us today (+61) 08 9419 7990

Thyssen Krupp Stacker 620

Stacker 620

Doina Engineering was awarded a contract for the fabrication, surface treatment and full assembly of Stacker 620 for Thyssen Krupp Materials Handling Australia.

All materials of the stacker were fully processed at our Mandurah road works. Fabrication, fully assembled which included installation of mechanical drives, sub-structure, mast & suspensions, equipment platform, tripper conveyors and boom sections.

All of the equipment was trial fitted prior to shipment to site. The Stacker was sub-assembled at AMC Henderson prior to sea and road transport to the construction site. The Stacker manufacturing was subject to 100% material and welding traceability.